Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4'' Male Pipe Thread (6)


Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4'' Male Pipe Thread (6) by Aquapro at Shelby & Simon. MPN: 69716. Hurry! Limited time offer. Offer valid only while supplies last. Water Heater Anode Rod; For Suburban And Morflo Water Heaters; 9-1/2 Inch Length; Magnesium; With 3/4 Inch Male Pipe Thread Drain Plug; With Retail Packaging; Lead FreeCompatibility: Suburban And Morflo Water Heaters. Significantly Extends The Water Heater Tank Life. Magnesium Anode Rods Will Attract The Elements That Cause Corrosion, Protecting The Tank From Those Elements. Material: Magnesium. 18 Percent More Magnesium For Extended Protection.


Aqua Pro 69716 9.5'' Long Lead Free Packaged Magnesium Anode Rod with 3/4'' Male Pipe Thread (6) by Aquapro
4.3 out of 5 stars with 38 reviews
Condition: New
Availability: In Stock
$69.24


Quantity:  

 


Product Description & Reviews

Water Heater Anode Rod; For Suburban And Morflo Water Heaters; 9-1/2 Inch Length; Magnesium; With 3/4 Inch Male Pipe Thread Drain Plug; With Retail Packaging; Lead Free

Features & Highlights

  • Compatibility: Suburban And Morflo Water Heaters
  • Significantly Extends The Water Heater Tank Life
  • Magnesium Anode Rods Will Attract The Elements That Cause Corrosion, Protecting The Tank From Those Elements
  • Material: Magnesium
  • 18 Percent More Magnesium For Extended Protection

Additional Information

Brand:
Aquapro
Manufacturer:
Aqua Pro
Category:
Water Heaters
MPN:
69716
UPC:
689271250859
Part Number:
69716
Publisher:
Aqua Pro

 


Have questions about this item (69716), or would like to inquire about a custom or bulk order?


If you have any questions about this product by Aquapro, contact us by completing and submitting the form below. If you are looking for a specif part number, please include it with your message.

First Name:
Last Name:
Email Address:
Your Message:

Related Best Sellers


mpn: 91580, ean: 0692931915807,
Replacement heating element for all marine water heaters. Bolt-in style. Note: RV heaters use a screw-in element.ATWOOD MOBILE PRODUCTS 91580, ATW91580.

mpn: 8541833724, ean: 0739955264822,
Atwood 91603 Jade Pilot Assembly Water Heater Parts Trailer Camper RV Atwood Water Heater Part 91603 Atwood Jade Pilot Assembly Includes Thermocouple and Tubing. Will Work on Pilot Models: GC6A, GC6A-3, GC6A-6, GC6A-7, G6A, G6A-2,and moreAtwood Water...

mpn: GSHP-0725T, ean: 6938546739105,
Heater pads are designed and engineered to protect RV holding tanks, pipes and steps from freezing. Winter convenience of Today's RV'er. Provides water for RV Trailer mobile home in Winter. Properly sized and installed Facon Heater Pads provide cons...

mpn: 20850, ean: 0014717208505,
The Camco 28'' ID x 2'' deep Aluminum Water Heater Drain Pan collects and drains off leaking water or water from an activated T & P valve. For gas or electric water heaters. Will not rust or crack. Includes 1'' drain fitting. Pre-cut side opening for...